Summary

The Federal Roads Office (ASTRA) is launching a project call for the establishment of fast charging stations (FCS) for electric trucks at selected rest areas and heavy goods vehicle control centres along national highways. Private operators are invited to plan, finance, build and operate this infrastructure independently. The project is part of the Roadmap for Electromobility 2030 and aims to advance the electrification of heavy goods transport in Switzerland. The application deadline is April 30, 2026. ASTRA supports operators by providing power connections up to the transformer station.

Persons

Topics

  • Electromobility in heavy goods transport
  • Charging infrastructure for electric trucks
  • National transport policy
  • Sustainable mobility

Detailed Summary

The Federal Roads Office is responding to the growing importance of electrifying heavy goods transport with a targeted infrastructure programme. The focus is on creating a publicly accessible fast charging network for trucks, while Switzerland already has a well-developed charging network for passenger cars.

The project call comprises three lots with a total of approximately 30 locations. These are strategically distributed across rest areas and heavy goods vehicle control centres along national highways. The award is made on the basis of quality assessment to the most suitable applicants via reservation agreements.

The selected operating companies receive a two-year planning phase after contract signature. ASTRA will advance-finance the power connections up to and including the transformer station; operators reimburse these costs through annual compensation payments. This cost-sharing arrangement significantly reduces entry barriers for private investors.

The programme is embedded in the Roadmap for Electromobility, a joint initiative by the federal government, cantons, municipalities, as well as business and civil society actors. It aims to accelerate the transition to electric vehicles and establish nationwide charging infrastructure.

Key Points

  • Project call aimed at private operators – Independent operation pursuant to reservation agreement
  • 30 locations planned – Strategically distributed across rest areas and heavy goods vehicle control centres
  • ASTRA covers electricity costs up to transformer station – Operators reimburse annually
  • Application deadline: April 30, 2026 – Detailed planning and construction within two years
  • Part of the Roadmap for Electromobility 2030 – Coordinated national e-mobility strategy
  • Reduces investment barriers for the private sector – Hybrid financing model

Stakeholders & Affected Parties

GroupRole
Private operatorsInvestors and operators of charging stations
Haulage companies & logistics providersBenefit from infrastructure for electric truck fleets
ASTRACoordinator and co-financier
Federal government/Cantons/MunicipalitiesStrategic partners of the Roadmap
Swiss heavy goods transportBeneficiaries of improved electrification conditions

Opportunities & Risks

OpportunitiesRisks
Nationwide charging network for electric trucksLow profitability for operators at unfavourable locations
Incentive for electrification of heavy goods transportDependence on operator quality and commitment
Reduced emissions in the transport sectorLong amortisation periods without additional subsidies
Attractive hybrid financing for investorsPossible delays due to planning processes

Action Relevance

For haulage companies: Examine early application for operating rights; align existing electric truck fleet plans with available locations.

For cantons and municipalities: Ensure coordination with local transport planning; clarify arrangements with rest area operators.

For ASTRA: Communicate quality criteria transparently; establish monitoring of implementation deadlines.


Quality Assurance & Fact-Checking

  • [x] Central statements and deadlines verified
  • [x] Project call details correctly captured
  • [x] Financing model correctly presented
  • [x] No unsupported speculation included

Additional Research

  1. ASTRA project call (original source) – Detailed application documents and location map
  2. Roadmap for Electromobility 2030 – Overall federal strategy and milestone targets
  3. FSO statistics on electric vehicles – Current market data on heavy goods transport

Sources

Primary Source:
ASTRA Press Release – "Fast Charging Stations for Electric Trucks: ASTRA Launches Project Call" (January 5, 2026)
https://www.news.admin.ch/de/newnsb/DI-AYyOZD4uYMIBWzfmdJ

Official Project Documentation:

  • Project call for the construction, operation and maintenance of fast charging stations for electric trucks (ASTRA)

Verification Status: ✓ Facts checked on January 5, 2026


This text was created with the support of Claude.
Editorial responsibility: clarus.news | Fact-checking: January 5, 2026